FENCE RULES – JASPER (COUNTY), MISSOURI

OVERVIEW

This page covers residential fences in unincorporated Jasper County, Missouri. Incorporated cities have their own municipal requirements. County health, floodplain and road programs have distinct territories; an urbanized-area stormwater rule is not automatically a countywide fence rule.

The county’s published environmental and road programs do not supply a general ordinary residential fence permit, height, yard-setback or material schedule. That is not proof that every fence is exempt from review. A mapped flood-hazard location, sewage lagoon, road right-of-way, mine-contaminated soil or larger land-disturbance project can bring an otherwise ordinary fence into a separate approval or construction requirement. A homeowner should identify the actual parcel and proposed work rather than borrow a nearby city’s six-foot rule. Updated November 2026.

Quick questionJasper County answer
Permit or approvalNo general ordinary fence permit is communicated by the published county programs described here. Floodplain development, onsite wastewater and qualifying land-disturbance approvals remain separate.
Typical fence heightNo general ordinary county residential maximum is established here. A regulated sewage-lagoon enclosure must be at least 4 feet high.
Placement & property linesNo general ordinary yard-fence setback is communicated. Actual rights-of-way, drainage, floodplain and onsite-system conditions can control placement.
Common fence materialsWood: no ordinary county material classification established here. Vinyl/PVC: same. Chain-link: same; lagoon wire specifications are separate.
Important local conditionsFence rules may be further affected by county or special-road-district rights-of-way, flood hazards, sewage lagoons, urbanized-area stormwater duties, contaminated soil, utilities, livestock and recorded private restrictions.
Official local resourceJasper County Environmental Services

The sections below distinguish ordinary yard fencing from these site-specific programs and explain the requirements that are actually stated.

GOVERNANCE

Jasper County is a first-class county, governed by its County Commission. The Jasper County Health Department administers the county’s onsite wastewater and environmental-health programs and is the primary agency for its urbanized unincorporated stormwater program. County classification alone does not establish a fence-height or permit rule.

The Commission appoints the Floodplain Administrator under the county floodplain ordinance. The Highway Department maintains roads in the common road district; Carthage, Carl Junction and Joplin special road districts have separate road contacts. County functions must be matched to the property and road rather than treated as one uniform countywide building department.

PERMIT AND APPROVAL REQUIREMENTS

• Ordinary fences and existing work: The published county environmental ordinances and road program do not communicate a general ordinary residential fence permit or a percentage-based fence-replacement rule. They also do not establish an ordinary fence’s historic-design review or a uniform private-home swimming-pool barrier dimension. These are limited findings about the programs described here, not an affirmative no-zoning/no-building-code declaration or a promise that any fence, replacement or pool barrier is unregulated. Actual use, site approvals and applicable public-health duties still matter.

• Health building-permit scope: The county has required a Health Department building permit for new residences and commercial facilities since May 1999, with a published $50 fee. Review addresses the 911 address, lot size, floodplain, mine waste and stormwater controls in unincorporated urban areas. The onsite ordinance defines this permit by residential/commercial use; its new-structure/restroom provisions do not turn every fence-post hole into construction of a residence. Its exception for a political jurisdiction issuing permits requires the minimum state and county requirements to be met.

• Floodplain development permit: Ordinance 2012-01, adopted October 9, 2012, requires a separate floodplain development permit before proposed construction or other development in the county’s mapped numbered/unnumbered A and AE areas. It adopts the Jasper County map index dated November 2, 2012, as amended and revised. Development includes land-changing work such as filling, grading and excavation; a fence project can require review even when it is not a dwelling. Actual mapped jurisdiction and proposed work govern.

• Floodplain application and appeals: The written application identifies the land, proposed work and use, assessed structure value and improvement market value, flood-fringe/floodway location, existing base-flood and proposed elevations, plans/specifications and the permittee or authorized agent’s signature. The Floodplain Appeal Board hears administrator errors, denials and variance requests; further appeal is to the Circuit Court under Section 49.615. A variance requires the minimum relief, good cause, exceptional hardship and the ordinance’s safety/no-increased-flood-height conditions. No variance may increase flood levels in a designated floodway.

• Urbanized-area stormwater territory: The county stormwater page describes its MS4 program as covering urbanized unincorporated areas, with the Health Department as the parcel-review route. The enacted erosion, post-construction and illicit-discharge texts identify the area by the 2000 census. The current 2026–2031 program plan describes the 2010 Joplin urbanized-area mapping, totaling 12.96 square miles, or 8,297 acres, and anticipates updating the ordinance wording. These are different boundary references. The Health Department’s parcel review should identify the applicable adopted boundary and current administrative mapping before a homeowner treats a lot as inside or outside the program.

• Erosion-plan threshold and exceptions: Within its covered territory, the erosion ordinance requires approval of an Erosion and Sediment Control Plan for land-disturbing work uncovering 1 acre or more. A single structure within a common development must follow the developer’s DNR land-disturbance permit and Storm Water Pollution Prevention Plan. The ordinance excepts immediately necessary emergency protection of life, property or natural resources, existing permitted nursery/agricultural operations and areas outside the specified unincorporated urbanized area. A county territorial exception does not waive separate Missouri DNR requirements.

• Erosion applications and decisions: The application identifies the owner/developer, consultant and principal contact and commits earth movement to the approved plan and inspector access on construction/grading days. County review is due within 30 days after the application and DNR land-disturbance permit are received. The ordinance permits proceeding under filed plans if the county fails to act within its stated 30-day period, unless extended by agreement; pending revised plans, county-established conditions govern. This is that ordinance’s review procedure, not a waiver of other required permits. Major changes follow the original approval process; minor field modifications may receive verbal county authorization.

• Post-construction approval: The covered post-construction program applies to construction disturbing 1 acre or more. Stated activities that may be exempt include qualifying logging/agriculture under approved conservation/timber plans, additions or modifications to existing single-family structures, isolated disturbances under one acre not part of a larger common plan, and county-deemed necessary repairs to stormwater practices. Redevelopment receives county review; these are not automatic exemptions for every residential project. The current program also addresses smaller sites within a larger common development plan.

• Post-construction application and waivers: The application includes two copies each of the concept plan and maintenance agreement and the nonrefundable review fee set by the county. Complete applications receive a decision within 30 business days; revised/additional submissions receive a decision within 15 business days. Final plans and construction records require the stated professional-engineer certification and county approval. A written waiver request must meet an ordinance ground, such as an approved equivalent plan, an adequately sized offsite facility with legally responsible maintenance, site infeasibility or county-credited nonstructural practices. Acceptable mitigation and protection against downstream damage remain required; a waiver is not a homeowner’s unilateral choice.

• Onsite permits and homeowner work: The county’s wastewater ordinance, effective September 1, 1995 and revised December 5, 2023, requires permits for constructing, installing, renovating, modifying, repairing or operating a sewage treatment system. Type, design and capacity must meet current 19 CSR 20-3.060 and applicable stricter county provisions. A lagoon’s fence is a system-protection feature; changing it must remain consistent with the approved system. Section 7.01 exempts property owners working on their own private system from registration if they construct no more than one system in three years. Separately, Section 7.03 states that a homeowner installing, adding to, altering or repairing the private system serving a permanent residence need not register or complete training, but still must obtain a permit and meet the other requirements; an indication of knowledge, such as a basic knowledge test, may be required. Confirm how the Health Officer applies these provisions to the proposed owner work.

• Onsite territory, repairs and lots: The county ordinance applies to domestic wastewater systems except properly DNR-permitted municipal/public-sewer connections and systems installed and inspected within cities whose codes are equivalent to both state standards and this ordinance. It states no general local acreage exemption. One repair permit may allow up to 100 feet of added lateral line without a new completed site evaluation; this does not promise unlimited repeated repairs. Lots platted/recorded or DNR-approved after May 6, 1999 need at least 0.92 acre per system. No more than one residence or commercial facility may connect to a system; a duplex counts as one residence under this provision.

• Onsite fees and inspection: The ordinance lists $50 building, $150 new-system, $50 repair and $150 noncompliance fees. Fees are nonrefundable and subject to annual revision. The Health Officer may waive existing single-family-system modification fees for undue hardship under the stated provision. Final-inspection notice is at least 24 hours, during normal business hours; inspections are not scheduled on weekends or holidays. These are health-system procedures, not a general yard-fence permit price.

• Onsite appeals: A person aggrieved by a County Health Officer decision may appeal to the Appeals Board by filing a written application with the County Health Officer within 30 days after notification of the decision. The Board must give at least 10 days’ notice of the hearing date and a reasonable opportunity to be heard.

• Contaminated-soil construction: The Environmental Contamination Ordinance requires checking contamination status before constructing a dwelling, child-occupied facility or recreational area and provides a building-permit/testing process for that covered construction. It does not say every isolated fence hole is a new dwelling. Previously remediated land may still have site-specific barriers, caps and restrictions. Disturbance must respect actual EPA/DNR remediation conditions and recorded controls; contaminated mine waste or chat may not be removed for uses contrary to EPA/DNR standards.

FENCE PLACEMENT RULES

• Ordinary lines and recorded rights: No general ordinary county front-, side- or rear-yard fence setback is established by the published programs described here. That does not authorize crossing a boundary, building in an easement or blocking drainage. Identify the actual property line, recorded rights and applicable site plans. House setbacks, septic-system separations and road routing requirements are not interchangeable fence setbacks.

• County and special-district roads: The Highway Department reports maintaining about 540 of the county’s 955 road miles in the common district and publishes driveway and utility-work permit routes. Carthage, Carl Junction and Joplin special road districts have their own contacts. The correct road authority and actual right-of-way control fence work near a road, ditch or culvert. These pages do not establish a universal county road right-of-way width or make a utility-work application the permit for every yard fence.

• County-road obstructions: Missouri Section 229.150 prohibits willful and knowing public-road obstruction or damage through the listed acts, including fencing across or upon the right-of-way and planting hedges within road lines. Its farming/ranching exception covers land improved using soil and water conservation practices conforming to the Missouri soil and water conservation program or Natural Resources Conservation Service technical standards, or using precision level grading practices. The section does not apply to counties with a charter form of government or cities not within a county. The road overseer or county highway engineer may give tracked written notice to remove the obstruction, make an approved repair or pay reasonable costs. After 30 days from tracked delivery without compliance, the authority may petition the associate circuit court with a cost estimate. An opportunity for hearing must be completed and the petition granted before the authorized entry. This is not a universal right-of-way width or permission for a neighbor to remove a fence personally.

• Flood-prone fence locations: Before a regulatory floodway is designated in a numbered A or AE zone, proposed development combined with existing and anticipated development may not increase the base-flood water level more than 1 foot anywhere in the community. Within an adopted floodway, encroachments require the stated engineering demonstration of no increase. Applicable development must be anchored against flotation, collapse and lateral movement, use flood-resistant construction and minimize damage. Altering or relocating a watercourse must preserve its flood-carrying capacity and follow the ordinance’s notice/approval requirements. Dwelling floor elevations are not a fence-height formula.

• Watercourses and existing drainage facilities: Within the illicit-discharge ordinance’s territory, a watercourse owner or lessee must keep the portion on the property free of trash, debris, excessive vegetation and obstacles that pollute or significantly retard flow. Privately owned structures within or adjoining the watercourse must not become hazards to its function or integrity. A fence must also respect recorded maintenance access and drainage facilities; it cannot be placed simply on the assumption that ownership allows obstructing a swale or channel.

• Stormwater maintenance and successor owners: Covered stormwater facilities have recorded maintenance easements and covenants binding subsequent owners, with reasonable inspection access and at least annual inspection. Operation, maintenance and repair records must be retained at least 3 years. If a facility becomes a public-health or safety danger, the written-notice procedure gives the responsible party 30 days to make approved repairs. After proper notice, county repair costs and penalties can become assessments or liens. A new fence must not defeat these existing facility duties.

• Contaminated-soil territory: The ordinance’s soil provisions cover designated Superfund areas generally between the Kansas line and County Road 170, and between the Newton County line and Highway M, with known uncontaminated areas excepted using testing data. Its private-well testing territory is broader, covering real property countywide; that does not make the soil boundary countywide. The ordinance says applicability ceases six months after completion of EPA Operable Unit 1 remediation. The current county program remains published, and no completion finding is established here; an owner should not assume that cessation has occurred.

• Survey markers: Missouri Section 60.355 protects the listed public-land-survey corners, boundary markers, benchmarks and horizontal-control monuments from knowing movement, removal, defacement or destruction by a person other than a registered land surveyor. It provides restoration-cost liability and the affected owner’s stated surveying-cost and attorney-fee remedy, alongside its misdemeanor classification. Fence construction does not authorize disturbing a protected marker.

• Notice before digging: Fence-post digging, augering and driving are covered by Missouri’s underground-facility law, including on private property. Notice through Missouri 811 is required at least 2 but no more than 10 working days before the expected start. The period begins at midnight after receipt and excludes Saturdays, Sundays and legal holidays. Notice gives the required excavator/responsible-person, location, start, depth, work and contact details. Limited tillage or temporary-marker exclusions are not a general structural-post exemption. Separately owned private lines are not a promise of universal location service.

• Utility responses: Participating operators ordinarily supply approximate locations or no-facilities responses within 2 working days, unless an extended start is agreed through the center. Work may begin before the scheduled date only after confirmation that all facilities are located. Either side may request a marking-clarification meeting within two working days; a trenchless notice also requires available depth information. An insufficient site description must be clarified by white markings, plans or an on-site meeting.

• Unanswered original notice: Under Section 319.030, an operator’s failure to respond to a proper original notice requires a second notice through the center before excavation. The operator then has 2 hours to mark or contact the excavator with its marking time. A second notice by 2 p.m. requires marking that working day; a later notice requires marking by 10 a.m. the next working day. Only failure to mark or contact as that subsection requires permits excavation after this process. The duty of care remains.

• Ticket life, markings and location care: A notice expires at 11:59 p.m., 21 consecutive calendar days from the work start date. Work may continue within its described area while valid and markings remain visible. Failure to begin within the stated ten-working-day period requires a relocate request before starting. Unusable marks require remarking with the original notice/response timing. Reasonable care to preserve marks is required; careless or repeatedly unnecessary remark requests can create cost liability. The approximate-location strip ordinarily is the facility width plus 2 feet on each side, with a wider operator designation for the specified unusual conditions. Before digging, determine best practices for horizontal and vertical confirmation; use hand or soft digging when possible. An incorrectly located or unmarked facility must be reported through the center, with an operator response within 2 hours by contact or correct location.

• Damage, emergencies and state highways: Damage, dislocation or disturbance of an underground facility or its trace wires, encasements, cathodic protection, permanent stakes and other protective items must be reported to the center. Pipeline contact/damage causing hazardous-liquid or gas release requires an immediate 911 call. Damage must not be concealed; repairs need the owner’s authorization. Narrow emergency temporary sewer repairs may follow notification to prevent further damage without advance owner authorization, but reporting still applies. Genuine emergency excavation requires reasonable precautions and notice as soon as practical; the operator must mark or contact within 2 hours and state its marking time if marking cannot be completed then. Excavation in a state highway or its right-of-way separately requires transportation-commission permission, subject to the railroad-right-of-way exception.

• Partition-fence system: Missouri Chapter 272 separates general-law and county-adopted local-option partition-fence systems. Which system applies depends on actual adoption and the fence’s circumstances, not simply the county’s name or classification. Neither system automatically makes every neighbor pay half of an ordinary privacy fence. The statewide Missouri fence guide explains the two systems; the following distinctions matter on residential acreage.

• General-law livestock fences: The general-law lawful-fence standard addresses a stock-resistant fence at least 4 feet high, with posts no more than 12 feet apart, using the stated posts, boards or wire, subject to mutual agreement or associate-court treatment. When one owner alone needs the fence, the statutory construction, recorded-cost and later-livestock-use procedure can create a future contribution claim; it is not an immediate automatic half-cost bill to a neighbor who does not need it. The general allocation procedure uses notice, the right-hand portion while facing from the owner’s land, and the stated viewer/court process; a different written allocation can be recorded.

• Local-option and shared-fence limits: Under a valid local-option system, the stated lawful-fence alternatives include a 4-foot four-board fence with the prescribed gaps/posts, or four barbed wires with posts no farther than 15 feet with a stay or 12 feet without one, or an equivalent fence. The system has its own contribution, no-need agreement, 90-day court and lawful-fence-value limits. A higher-cost decorative design does not automatically enlarge a neighbor’s liability. General-law division-fence removal requires owners’ consent except for opening a public road; local-option text has an additional repair exception. Repair-entry rights are not general permission to enter neighboring land to build a new fence.

• Removal between cultivated fields: Section 537.350 separately addresses removing a partition fence adjoining cultivated land: it requires 6 months’ notice and provides its stated statutory and double-damage remedies. In an action or prosecution under Sections 537.340, 537.350 or 537.370, Section 537.360 limits recovery to single damages and costs if the defendant had probable cause to believe that the land where the alleged trespass occurred, or the thing taken, carried away, injured or destroyed, was the defendant’s own. Neither provision decides title merely from where an old fence stands.

• Livestock on residential acreage: Section 270.010 prohibits permitting horses, mules, donkeys, cattle, swine, sheep or goats to run at large outside their enclosure. Anyone may restrain them, and a sheriff or officer with police powers must do so. Written notice to a known owner is due within 3 days, stating feeding/keeping compensation and claimed damage. Reasonable taking-up, feeding and keeping costs plus actual damage are recoverable under the statute; an unknown owner or unpaid stated compensation leads to the stray-law process. In a public-road accident, the statutory defense requires establishing escape through no fault or negligence of the owner.

FENCE HEIGHT AND VISIBILITY RULES

• Ordinary height and visibility: The published county programs described here do not establish a general ordinary residential fence-height maximum, front-yard opacity percentage or corner-fence triangle dimension. This limited finding is not permission for unlimited height or unsafe visibility obstruction. Actual road, floodplain, health, development and private-property conditions can still control the proposed fence.

• Lagoon enclosure minimum: A regulated sewage lagoon needs a protective fence at least 4 feet high under 19 CSR 20-3.060(6)(D)15. That is a safety minimum for the lagoon enclosure, not an ordinary residential privacy-fence maximum.

MATERIAL AND CONSTRUCTION LIMITS

• Wood, Vinyl/PVC and Chain-link: No general ordinary county residential material classification for wood, vinyl/PVC or chain-link is established by the published programs described here. Those sources also do not communicate a general county electric- or barbed-wire yard-fence ban. Neither finding grants unrestricted approval; livestock-fence law, lagoon wire standards, site-specific approvals, safety and private restrictions remain separate.

• Lagoon wire, posts and bottom: The state lagoon standard requires welded, woven or chain-link wire no smaller than 14 gauge; cattle or hog panels with T-line posts are another stated option. Posts are pressure-treated wood or galvanized/painted steel, driven, tamped or set in concrete. Line posts must be no more than 10 feet apart; at least 18 inches deep is recommended. Corner posts must be braced; at least 24 inches deep is recommended. Keep the fence sound, without gaps or openings at the bottom. Recommended depths are not the same as mandatory spacing and bracing.

• Lagoon location, gate and completion: The lagoon fence may be no closer to the water’s edge than the berm’s center at a 3-foot operating water depth. A setback no greater than 30 feet from the water’s edge is recommended. The state rule requires a properly hinged gate at least 4 feet high, of comparable material with an effective latch; 36–48 inches is the recommended width. The enclosure must be complete before dwelling occupancy. Recommended setbacks and widths do not weaken the mandatory gate, height or completion duties.

• State acreage conditions and local health rules: Section 701.031 has a qualifying owner single-family-residence-lot branch of at least 3 acres, and a separate residential-lot branch of at least 10 acres with no single-family residential onsite system within 360 feet of another system and no more than one single-family residence per ten acres in aggregate. Lots adjoining Corps of Engineers or public-utility lakes are excepted. Every system point must be more than 10 feet from adjoining property lines, with no effluent entering adjoining property, contaminating surface/groundwater or creating the specified scientifically determined nuisance. Stricter lawful local requirements remain possible; Jasper County’s ordinance does not state a matching acreage waiver. These state conditions are not a promise of exemption from the county program.

• State fee suspension: The separate state $90 onsite application fee is temporarily suspended effective August 28, 2026, under the DHSS notice. This is not a permanent repeal or a waiver of Jasper County’s own fees, permits or lagoon-safety requirements.

• Erosion plan and phasing: For a covered project, the plan identifies the clearing/construction sequence, exposure duration, temporary/permanent controls, seeding and soil preparation, maintenance and DNR permit. Sites disturbing more than 5 acres require approved phasing. Except for installing control devices, clearing cannot begin until sediment controls are installed and stabilized. Cut/fill slopes may not exceed 4 horizontal to 1 vertical unless the county approves another slope for the stated objectives. These are land-disturbance controls, not a slope rule for every existing yard.

• Stabilization, stockpiles and neighboring land: If continuous site work stops for more than 14 days, stabilize the soil within the following 7 days. If vegetative controls are not established within 30 days, the county may require reseeding or a nonvegetative option. Stabilize or cover stockpiles at each workday’s end by tarping or surrounding silt fence; control dust and divert upland runoff past disturbed slopes. Sediment basins, traps or tanks and perimeter controls, plus vegetated buffers for adjoining property, are required as applicable to the approved work.

• Waterway crossings and construction access: Regular crossing of a wet watercourse during construction needs an approved temporary crossing and all necessary local, state and federal approvals. Stabilize a channel before, during and after in-channel work and protect pipe, flume and paved-channel outlets. Covered sites need stabilized construction entrances; adjacent public streets must be scraped and swept daily to the inspector’s satisfaction. The ordinance incorporates the county Erosion and Sediment Control Guidelines for technical design. Those unlocated technical details are not restated here; the stated ordinance thresholds and controls still apply.

• Post-construction stabilization and future manual: For covered development, revegetate cleared land within 10 days of substantial completion. Reseeding needs mulch or equivalent erosion control until cover is established over 90 percent of the seeded area; survival must reach at least 75 percent throughout the following year, with repeated revegetation until met. Approved landscaping/maintenance plans remain applicable. The 2026–2031 plan expects ordinance updates and a companion Stormwater Design Manual by September 2027. That planned future manual is not treated here as an already adopted source of new fence requirements.

• Illicit discharges and spills: Within the covered territory, illicit discharges and connections to storm drains are prohibited, including specified old connections. The ordinance’s pool-water exception is for dechlorinated water, typically below 1 ppm chlorine; it is not a general right to drain onto a neighbor or ignore other restrictions. Known/suspected releases require discovery, containment and cleanup; hazardous releases require immediate emergency-dispatch notification. Nonhazardous releases must be reported to the county no later than the next business day; an in-person or telephone report needs written confirmation within 3 business days.

PRIVATE RESTRICTIONS

Recorded covenants, subdivision restrictions, homeowners-association design rules, plats, easements and enforceable boundary or fence-maintenance agreements may add obligations subject to Missouri law. Existing stormwater maintenance covenants, remediation controls and access easements deserve particular attention before replacing an old fence.

A county approval does not establish the property line, ownership of a shared fence, a neighbor’s cost contribution or permission to enter another parcel. An old fence’s age or location alone does not settle title. Private rights and public partition-fence duties remain separate from environmental, road and health approvals.

REVIEW AND ENFORCEMENT CONTEXT

Fence issues are typically reviewed during permit or approval review when required, and through complaint-based code enforcement. Examples include:

• Property and project review: Floodplain development, health-system and covered stormwater approvals, contaminated-soil construction and actual county/special-district road rights.

• Construction and maintenance: Required lagoon fencing and gates, erosion controls, drainage access, watercourse obstructions and maintenance of existing stormwater facilities.

• Illicit-discharge appeals: A person receiving a Notice of Violation may appeal the county’s determination; the notice of appeal must be received within 10 days from the date of the Notice of Violation. The hearing takes place within 15 days from receipt of the notice of appeal. If the decision is upheld, the stated procedure allows 30 days after that decision to correct before the county’s abatement measures. These deadlines belong to that program, not every county fence dispute.

• Private matters: Boundary, ownership, easement, covenant and contribution disputes remain distinct from public county approvals and enforcement.

USING THIS INFORMATION

This page provides general orientation on how residential fence rules are structured and applied within unincorporated Jasper County, Missouri. Updated November 2026.

In addition to local fence rules, certain Missouri laws apply statewide. See Statewide Fence Laws in Missouri.

It is not legal advice and does not replace official statutes, ordinances, orders, permits, certificates, development approvals, applicable building-code requirements, surveys, recorded documents or professional guidance. Rules and interpretations may change, and application may vary with the identified municipality, including its actual municipal or county class, charter, adopted program or special district, and each function’s verified territory, the authority responsible for each issue, current code requirements and amendments, zoning and site conditions, subdivision or plat conditions, easements, rights-of-way, drainage and floodplain requirements, historic or design districts, pool use, agricultural or livestock conditions, fence ownership and shared-fence duties, excavation requirements, and private restrictions subject to Missouri law. Applicable requirements depend on the property’s actual facts and the respective authority of the identified offices. Private agreements and recorded rights remain separate from government approvals. If this page conflicts with controlling law, adopted regulations or official requirements, the controlling authorities govern.