FENCE RULES – DEL CITY (CITY), OKLAHOMA
OVERVIEW
This guide covers residential fence installation, replacement and repair within the incorporated City of Del City, Oklahoma. A Del City mailing address alone does not establish city jurisdiction. Updated November 2026.
Del City’s approved March 17, 2025 council minutes report adoption of a change allowing private-property fencing without the former blanket fence permit. Commercially zoned property still has an express fence-permit requirement. Separate building administration, pool barriers, drainage and floodplain work, contractor licensing and Storybook Ranch design approval can still matter. The City’s currently linked zoning standards generally keep fences behind the front building line, limit ordinary fences to eight feet and impose a four-foot branch on certain street-side corner yards. R-1-LH and Storybook Ranch have narrower wood-fence requirements.
| Quick question | Del City answer |
|---|---|
| Permit or approval | Approved March 17, 2025 council minutes report adoption of a change allowing private-property fencing without the former blanket fence permit. Commercial zoning still requires one; have the Building Official resolve separate building approval and any site-specific certificate or permit. |
| Typical fence height | Generally no more than eight feet above ground under published A-492; four feet in the specified street-side corner configuration. R-1-LH and Storybook Ranch have six-foot conditions. |
| Placement & property lines | Keep behind the front building line; preserve corner visibility, surveyed boundaries, easements and drainage. Back-to-back corner placement has a distinct rule. |
| Common fence materials | Wood: required in specified districts. Vinyl/PVC: not allowed in R-1-LH or as Storybook alternative. Chain-link: also excluded there. Elsewhere apply industry-standard construction and applicable screening/pool rules. |
| Important local conditions | Fence rules may be further affected by Storybook Ranch, R-1-LH, commercial zoning, pools, easements, drainage/stormwater, grading and floodplain conditions, and private restrictions. |
| Official local resource | Del City Planning and Zoning; City Code |
The table is for quick reference; read the detailed conditions and official links below before buying materials or starting work. Have the Building Official resolve the separate building-approval question for the actual fence, and confirm the zoning district, corner-lot configuration and any Storybook Ranch, easement, drainage, pool or floodplain condition.
GOVERNANCE
The City’s Community Development Department and Building Official administer building, fence-contractor and related approvals; Planning and Zoning administers zoning. The Planning Commission serves as the Preservation Board for Storybook Ranch. The Board of Adjustment has distinct building, preservation and flood-review roles under the provisions described below. Use the official Planning and Zoning page and Del City Code of Ordinances for the responsible City offices.
Oklahoma’s minimum residential construction standard is the 2024 International Residential Code with Oklahoma amendments, effective September 14, 2026. Lawful higher local requirements and separate local permit administration remain applicable. The Oklahoma residential-code adoption record identifies the current state edition. The International Swimming Pool and Spa Code reference in Appendix BQ is not mandatory merely because the state residential code applies; a specific local adoption is needed.
Qualifying annexed agricultural property: Under 11 O.S. §21-103(J), a parcel of at least 5 acres used for agriculture and annexed on or after July 1, 2003, or a parcel of at least 40 acres used for agriculture before annexation and continuously afterward, receives the stated protection from municipal land-use and building ordinances only to the extent the use or construction relates to agriculture. Where no residence is within 50 feet of the parcel boundary, the additional conduct protection applies only to conduct that is not a state-law offense. The exemption does not displace ordinances under 11 O.S. §43-101.1 or applicable airport, spaceport and military-installation operational controls. Property discharging into the municipal water, wastewater or sewer system remains subject to ordinances and regulations for that system’s environmental compliance. A large lot, agricultural zoning or a residence alone does not establish this exemption.
Published zoning and the later fence amendment: The City currently links a zoning ordinance PDF, A-492 and related sections internally revised December 14, 2015. Its substantive yard, height, visibility and district standards below are the published starting point. The approved March 17, 2025 minutes, item 7 expressly record adoption of Ordinance 1436 allowing private-property fencing without a permit and adding commercial rules. The minutes establish the reported adoption and purpose, rather than the full amended ordinance wording. Consequently the old A-492 blanket permit paragraph is not a reliable current permit instruction. The actual project must also satisfy the current Chapter 5 provisions and independent site approvals.
PERMIT AND APPROVAL REQUIREMENTS
Residential fence permit and separate building approval: The approved March 17, 2025 minutes report adoption of Ordinance 1436 to allow private-property fencing without a permit, replacing the former blanket fence-permit approach. That account is not the complete operative ordinance text. It does not establish that every residential fence needs no approval. Section 5-6 separately requires permits for work on new or existing structures unless specifically exempted; section 5-21’s published 2015 IRC amendments delete R105.2 Building exceptions 1, 2, 4 and 5, including the fence exception. Section 5-20 similarly deletes 2015 IBC Building exceptions 1, 2, 3, 5 and 6. Section 5-12 applies the specific provision over the general, otherwise the more restrictive requirement, and preserves other City and zoning rules. Ask the Building Official to determine whether the actual residential fence requires a separate building approval under the later fence amendment and current administration. Do not rely on a model-code seven-foot exemption or the obsolete blanket permit paragraph. Oklahoma’s current technical minimum remains applicable.
Commercial zoning and fees: Section 5-83 expressly requires a fence permit before installation or modification on commercially zoned property, including a residence on such land. Section 5-84 requires a six-foot sightproof fence where commercially zoned land abuts residential zoning. The fee schedule lists commercial fence permits at $50 plus required registered-engineer review and residential fence permits at $10; a fee listing alone does not create a residential permit trigger. Where a building permit applies, the Official may require plans, specifications and supporting data. Section 5-8 ordinarily gives permits 180 days; extension needs official approval and the required fee.
Licensed fencing work and owner-occupant work: Sections 5-150 and 5-156 require a current City fence-contractor license for the business of installing, repairing or altering fencing, with a $5,000 contractor bond; employees work through the licensed employer. Section 5-152 permits the Building Official, in sole discretion, to allow an owner-occupant of a single-family dwelling to do otherwise licensed work after demonstrating the ability to complete it properly and within a reasonable time. Unapprovable work must be performed by a licensed contractor. This is not an automatic do-it-yourself exemption.
Storybook Ranch certificate: Within the mapped preservation district in section 16-231, a new fence, or repair/replacement changing its size or material, is a minor alteration. Sections 16-232–236 require a no-fee Certificate of Appropriateness for exterior modification, with application and supporting documentation to the Building Official. The certificate precedes, and does not replace, other required permits. Same-material, same-size fence repair/replacement is expressly waived; other waiver is discretionary and must remain consistent with district rules. The Official may approve, condition, deny or forward minor work; the Planning Commission, acting as Preservation Board, hears major alterations and forwarded or appealed minor work after public hearing. Section 16-233 also provides a Design Guide filed with the Clerk; confirm an applicable preapproved design with the Official.
Storybook Ranch appeal: Section 16-240 allows an Official’s final certificate decision to go to the Planning Commission without a fee. A Commission decision may go to the Board of Adjustment for $100, testing whether it was arbitrary and capricious rather than substituting judgment for reasonable discretion. File a complete documented application with the Official within ten days after the final written decision, including the required recordable running-with-land City indemnification. Relief is the minimum necessary and may be conditioned or remanded. When the Board grants a certificate on appeal, issuance of that certificate is stayed at least 30 days.
Chapter 5 building appeal and variance: Under sections 5-171–176, an aggrieved applicant files notice with the Building Official within five days after issuance or communication of the decision, identifying the specific decision and relief requested and paying the filing fee. Filing automatically stays enforcement until the appeal is decided or the applicant fails to proceed timely. If a stay potentially causes imminent harm to person or property, the Official transmits a statement to the Board of Adjustment Chair; the administrative officer causes it to be mailed to the applicant and posted on the property, after which the stay is immediately lifted. The applicant may respond within five days by requesting a Board hearing on whether and to what extent a stay should apply. The hearing is held as soon as practicable and, barring extraordinary circumstances, within five days after the request. Submit the appeal application within ten days after notice; unavailable required documents require an incomplete application and expected completion date, with a reasonable submission period set by the administrative officer. The officer checks completeness and may require further information; failure to complete or respond within the set period can cause rejection and case closure. Appeals concern interpretation, applicability or an equally good or better proposed construction method, not waiver of code requirements. A variance may be requested at any time on the required form with fee and supporting information, specifying each Chapter 5 code section/regulation and exact relief; it cannot vary other City Code or zoning provisions, which have separate procedures. A variance cannot authorize unsafe or nonworkmanlike development or injury/adverse impact to property. The hardship must be resolvable only by the requested variance, not self-created and not solely financial; relief must be the minimum necessary and consistent with the public interest. Before final action the Board reviews a draft perpetual running-with-land instrument stating the variance and possible noncompliance and indemnifying/holding the City harmless; filing it with the County Clerk is required before the variance becomes effective. At least three concurring Board votes are required. Conditions, mitigation and a performance bond may be imposed; the Board Chair signs any resulting permit as issuing authority. Section 5-176 requires grounds notice to both the City Clerk and Board Clerk within ten days after announcement of the Board decision; read it with the applicable state judicial procedure below.
State Board hearing and appeal framework: For a Board of Adjustment matter, 11 O.S. section 44-108 ordinarily requires newspaper publication and Board-clerk mailed notice to owners within 300 feet of the exterior boundary, both at least 10 days before hearing. Notice states legal description, address/approximate location, zoning, requested relief and hearing time/place. Adjacent-owner-only mailed notice is available for minor variances/exceptions only under a governing-body-approved Board policy. Section 44-109 requires administrative appeal notices specifying grounds filed with both the originating officer and Board within the time fixed by municipal ordinance, not a universal state ten-day period. The officer transmits certified papers and ruling; the Board sets a reasonable hearing and decision time, gives public/interested-party notice and permits personal, agent or attorney appearance. Proceedings stay unless, after the appeal notice has been filed with the originating officer, that officer certifies to the Board facts showing that a stay would in the officer’s opinion cause imminent peril to life or property. In that case, only a restraining order granted by the Board or a court of record on application or notice to the originating officer and on due cause shown stays proceedings. Obtain the applicable Del City ordinance deadline promptly for the actual decision.
Judicial appeal and its separate stay: Under current section 44-110, people entitled to mailed hearing notice, persons whose property interests are directly affected, and the municipal governing body may appeal a Board decision to the proper district court. File grounds notice with both the municipal clerk and Board clerk within the time fixed by ordinance; no bond or cost deposit is required merely to appeal. Record papers and decision are transmitted; trial is de novo and preferred over other civil actions. The court may affirm, reverse or modify; Board costs require gross negligence, bad faith or malice, and further appeal follows ordinary civil procedure. Appeal alone does not suspend the Board decision. Section 44-110(E) supplies the exclusive district-court stay route: apply for a stay and first-class-mail notice to all appeal parties and any Board applicant. Filing temporarily stays further proceedings until the hearing, held within 30 days. The court considers likely success, irreparable property harm, effects on others and public policy. An imposed stay requires security/protective terms, posted within 10 business days, except the governing body’s bond exemption. Subject to 12 O.S. section 990.3(A), it dissolves after the merits judgment/decree/final order is filed; staying that judgment itself follows section 990.4.
Drainage plan trigger: Sections 16-31–42 apply except to land without habitable structures actively used agriculturally. Residential acreage is not automatically exempt. A professional-engineer drainage plan is required for development/redevelopment exceeding one acre, subdivisions, smaller projects the Official judges potentially adverse to the watershed, or drainage improvements proposed for public acceptance. Show existing, proposed and fully urbanized conditions with calculations and improvements; one-foot contours may be required. Submit three paper copies, at least one letter-sized, and electronic plan/calculation data. Outside engineer review is at applicant cost; on request the City obtains at least two written bids and selects the lowest. The applicable officials may grant only the minimum hardship accommodation that will not foreseeably damage the watershed.
Grading permit and small-lot exception: Under sections 16-151–157, earth changes need a grading permit except compliant agriculture; routine maintenance/landscaping with no off-property stormwater discharge; excavation, grading, leveling or paving on a single-family lot of one acre or less unless part of a larger development with cumulative earth change exceeding one acre; and emergency repair, with earliest practical permitting. Covered work costs $20 plus necessary outside review. Submit two paper and one electronic copy of the description, scaled drawing, schedule, any required detention data and owner no-adverse-impact certification. If no CSD permit is required, include an erosion/sediment plan. Obtain approval before changes; keep drainage functional and allow inspection. Permits last 180 days, with no additional renewal charge; failure to renew within 30 days can produce $50 per 30 days and stop-work. Close a valid permit through the grading termination notice, final inspection and two paper/one electronic as-builts. Repeated violations or untimely correction may incur $100 reinspection.
Construction stormwater permit: Sections 16-161–167 separately address construction causing or potentially causing land disturbance. Exemptions include minor home gardens, landscaping, home repair/maintenance and related minor erosion; separately built structures on lots under one acre outside subdivisions over one acre, with building permits, limited foundation/basement/service/sewer excavation or minor driveway/yard/sidewalk grading and no offsite pollutants; and connections to existing structures. Listed agricultural/farm-building work, USDA-supervised conservation work, protected oil/gas activity, hard-surface public-utility work with pollution controls and railroad work have separate narrow exceptions. Small lot size alone is insufficient. Exempt work retains runoff/sediment duties. A CSD permit costs $100 plus necessary outside review. Submit two paper/one electronic SWPPP, erosion/sediment drawings, schedule, applicable state/federal notices and responses, stormwater correspondence and owner responsibility certification. Approve changes first. Duration is 180 days, renewal has no additional fee, and overdue renewal can cause $50 each 30 days and stop-work. Close a valid permit with the CSD termination notice, final inspection, repair/inspection log and applicable ODEQ documents; missing logs cost $500, with applicable penalties and $100 reinspection for repeated or uncorrected violations.
• Erosion controls during work: Section 16-160 applies to construction creating stormwater discharge: minimize clearing; do not clear vegetation more than twenty days before earthwork. Stabilize, to the extent feasible, within seven days where work remains unfinished more than fourteen days, then establish perennial cover after final grading. Controls operate before earthmoving and temporary devices are replaced at each workday’s end. Protect neighbors/public ways, entrances, channels and inlets; settle/filter muddy excavation water where practicable and maintain concrete washout. Inspect/repair biweekly in dry periods, within twenty-four hours after half an inch of rain in twenty-four hours, and daily in prolonged rain. Impaired-creek watersheds require weekly dry inspections plus storm/daily checks. Keep onsite logs, designate the responsible person and post applicable permit numbers, contact and twenty-four-hour phone. Permit exemptions do not remove sediment/runoff duties.
Flood-hazard development approval: Sections 16-59–93 require a floodplain development permit before covered manmade changes in the special one-percent flood-hazard area, including structures/appurtenances, excavation, grading, fill and paving. The property owner and entity performing the work apply. The Floodplain Administrator may require professional site/topographic plans, data and conditions; permits last 180 days with extension for regular ongoing work. The adopted Oklahoma County study dated December 18, 2009 includes revalidated and later approved map changes, so confirm current parcel mapping. Where detailed data are lacking the applicant supplies FEMA-standard information. A single residential lot permit is $25; multiple residential lots $100, single nonresidential lot $100 and multiple nonresidential lots $500. Conditional map revision, watercourse alteration or zero-rise review costs $1,000 plus outside professional review; regular channel maintenance has no fee. After-start applications normally cost triple, with discretionary good-faith relief and authorized fee adjustment for good cause.
Flood decision and local relief: Sections 16-124–128 designate the Board of Adjustment to hear appeals/variances and subpoena evidence or witnesses; failure to provide requested evidence, technical data or testimony may support denial. Use the Floodplain Administrator’s forms, supply all required information and pay the separate $100 local filing fee. File written appeal notice with the Administrator within five days after first awareness of the decision or interpretation. Adjacent owners and the state coordinating agency receive mailed notice at least ten days before hearing. Appeals correct only clear error and cannot suspend the ordinance; final action notice goes to applicant and state agency within fifteen days. A variance may never authorize development not reasonably safe from flooding. The applicant must technically demonstrate good and sufficient cause arising from unique site size, configuration or topography making elevation standards inappropriate; exceptional hardship rendering the lot undevelopable without relief; no increased flood heights, public-safety threat or extraordinary public expense; and the minimum necessary relief considering flood hazard. No regulatory-floodway variance may increase base-flood elevation anywhere in the watershed. A lowest finished floor below design flood elevation requires written warning of increased life/property risk; below base flood elevation requires separate written warning that NFIP insurance cost reflects the increased risk. Before a development permit, provide evidence that the high-risk variance instrument has been filed with the County Clerk and, separately, that the City-indemnity instrument has been executed; the latter provision does not itself require recording. The section expressly allows historic repair, improvement or rehabilitation without regard to its specific requirements when continued historic designation is preserved and the variance is the minimum needed for historic character/design. Work causing loss of designation cannot receive that variance and must comply with the ordinance and building codes. It also expressly allows necessary functionally dependent development without regard to the section’s specific requirements when relief is minimum necessary and due consideration is given to methods/materials minimizing base-flood damage. Final variance action notice goes to applicant and state agency within fifteen days.
Separate state floodplain procedure, when applicable: Under 82 O.S. sections 1615–1618, the Act does not apply to a jurisdiction meeting federal floodplain requirements as of the Act’s date and participating before May 13, 1980; administrators of exempt jurisdictions still require accreditation. A later map date alone does not establish that exemption. Where the Act applies, section 1615 allows relief only from local requirements more stringent than the Act’s minimum, on adequate proof that compliance with the local regulations would result in an arbitrary and unreasonable taking of property without sufficient benefit or advantage to the people, with no continuing unreasonable hazard or liability release. Petition the floodplain board with the statutory $25 fee; the board hears each request and weighs applicant/public equities. The petitioner pays for publication of hearing time/place in the nearest regularly published general-circulation newspaper at least 30 days beforehand. Relief lasts at most 20 years; send OWRB a copy within 15 days. These conditions do not waive the state minimum or replace Del City’s independent stricter local conditions.
Separate state floodplain appeal, when the Act applies: Section 1616 routes a county/municipal floodplain board or administrator decision to the area’s Board of Adjustment, or governing body if there is no Board. An aggrieved person or affected public officer/department/board/bureau files written grounds with both the appellate body and floodplain board within not more than 10 days. Proceedings stay unless the board or administrator certifies facts supporting imminent peril to life or property. The appellate body hears alleged legal error, can affirm, reverse wholly or partly or modify using the original authority’s powers, and applies all applicable regulations/plans. A final OWRB development-permit decision follows the Administrative Procedures Act. This is not the zoning appeal route or its filing clock.
FENCE PLACEMENT RULES
Front line and street-side corner: Published A-492 prohibits fences or walls in front of or beyond the front building line, and hedges may not extend into the street right-of-way. On a corner lot whose exterior side abuts an interior lot’s front yard, the fence cannot extend past the side building line. On back-to-back corner lots the street-side fence may reach the property line, subject to height and visibility restrictions. The street pavement, curb and an existing fence are not substitutes for the surveyed lot and right-of-way lines.
Easements and pool siting: Section 5-82 makes the owner responsible for fence removal/damage costs when utility maintenance or access affects a fence in, over or across a City easement, and for utility damage caused by installation, maintenance or lack of maintenance. It does not grant an easement right. A-490.1 separately keeps pool/equipment off easements; a walk/deck there cannot restrict utilities and is removed/restored at owner cost when necessary. Its five-foot pool inside-wall setback, fifteen-foot separation of pool/equipment from adjacent residential buildings and front/side-building-line restrictions are pool siting rules, not fence setbacks. Prevent drainage/oversplash onto neighbors.
Drainage and floodwater: A-492 prohibits blocking normal surface drainage. Sections 16-37–42 require applicable detention for new/redevelopment adding impervious surface, addressing the one-percent and lesser storms without greater postdevelopment runoff; single residential lots of one acre or less are exempt from detention only. Plans generally accommodate the one-percent rain event and closed sewers the twenty-percent event or approved equivalent. Do not alter, grade or pave an approved-plan area without updating the plan. Drainage-easement dedication does not assign City maintenance. Owners maintain improvements, inspect and keep easements/channels clear; assigning an association does not erase the original improver’s ultimate duty. In a floodway, section 16-92 bars encroachment unless hydrologic/hydraulic analysis proves no increased base-flood elevation, peak discharge or velocity anywhere in the watershed, or the community has obtained the FEMA conditional map change. Without a designated floodway the cumulative base-flood rise limit is one foot unless the community first applies for conditional revision. Section 16-93 requires hydraulically equivalent below-base-flood compensatory storage for covered fill/structures, working for the one-percent and lesser events, freely draining and not increasing stage, peak or velocity; storage below pond water receives no credit.
Existing stormwater devices: Sections 16-171–178 require a PCSD license when a permanent structural or nonstructural stormwater-quality BMP exists on the parcel; a fence alone does not create that duty. Initial fee is $200 plus $50 per BMP; unexpired renewal/transfer $100. Submit two paper/one electronic site plan, BMP description, structural as-builts and owner certification. Obtain approval before alteration and maintain the design with monthly inspection logs. Licenses expire June 30; more than 30 days overdue can cause $50 per 30 days or occupancy revocation. Destruction/removal from service needs termination notice, final inspection and log; a missing log may cost $500.
Public access and vegetation: Sections 19-2–7 prohibit undue obstruction of sidewalks, streets or alleys and require adjacent owners/occupants to prevent sidewalk hazards. Vegetation clearance is twelve feet over roadways/alleys and eight feet over sidewalks; intersection shrubs within fifty feet in either direction cannot exceed two feet. These are vegetation rules, not fence heights. Five-day trim notices can precede daily offenses. The narrow business-obstruction exception needs written Clerk application, fire/police approvals and Council majority approval with restrictions; it is not private-fence right-of-way permission.
Boundaries and shared fences: A fence, hedge, ditch, tax map or pavement edge does not by itself establish the legal boundary. Under 60 O.S. §70, adjoining owners are mutually and equally bound to maintain their boundary monuments and division fences, except when one chooses to let the land lie as a public common. Later enclosure requires a just proportion of the division fence’s value at the time of that later enclosure. This is not an automatic requirement that a neighbor pay half of every new residential fence.
Survey showing an existing fence crosses the boundary: Under 4 O.S. §150.1, before damaging or removing that fence or authorizing the described improvements, including utility installation, on the disputed property, the surveying owner must give the adjoining owner notice containing the survey, the relief requested and notice of possible attorney fees and costs. Service must follow 12 O.S. §2004. If no agreement is reached within 30 days after receipt, the owner may file an action to establish title in the district court of the county where the property is located. The court must provide temporary relief needed to preserve the status quo. Separately from the notice’s possible-award wording, §150.1(C) entitles the prevailing party to an award of attorney fees and costs. Thirty days is neither a deadline to sue nor permission for self-help removal, and a survey does not itself decide title.
Other partition-fence removal conditions: Title 4 §§149–150 preserve payment for damage before removing a fence later found on another’s land. If the person who built the misplaced fence or improvement fails to pay the damages and remove it within 6 months after establishment of the division line, and after 30 days’ removal notice from the landowner, §149 makes it part of the real estate belonging to that landowner. Fence viewers may determine disputed damages. Under §150, a fence or other improvement, except substantial buildings, made of timber or other material taken from the land where it lies cannot be removed until the party pays that landowner the material’s value, as determined by fence viewers. A fence cannot be removed when doing so would expose the other party’s crop; it must be removed within a reasonable time after the crop is secured, even if six months has passed. Section 152 permits a fence on the line between adjoining owners, partly on each side, and gives its owner the same removal right as if it stood wholly on that owner’s land, provided the fence is not more than 5 feet from that line. This is not a general right to enter or occupy a neighbor’s five-foot strip, decide title or bypass the other applicable notice, damage-payment and crop-protection conditions. Section 153 preserves other legal proceedings to determine land title or divide the disputed line and allows the parties to agree. Oklahoma’s partition-fence statutes supply these conditions for disputed shared-fence changes.
Before digging — covered work and exclusions: Under 63 O.S. §142.2, excavation means digging, compressing or removing earth, rock or other material in or on the ground using mechanized equipment or blasting, including such work as augering, boring, drilling, grading and trenching. Moving earth with tools powered only by people or animals is excluded, except in a private or public easement or right-of-way. A separate exclusion covers human-powered burial of a communications provider’s communication lines in such an easement or right-of-way only when the depth is no greater than 12 inches and the work is within 12 inches of that provider’s terminal. The agricultural exclusion covers cultivation for agricultural purposes and augering, dozing by noncommercial dozer operators or digging for postholes, farm ponds, land clearing or other normal agricultural purposes; it is not a blanket exception for any residential posthole. The Act also excludes an individual excavating on that individual’s own property who is not in the excavating business for hire, except in a private or public easement or right-of-way. Do not extend that owner exception to a hired contractor or easement/right-of-way work.
Covered excavation notice and responses: Section 142.6 requires notice before covered demolition, explosives or excavation in a highway, street, alley or other public ground or way, on or near an operator’s underground facilities, or in a private easement. Notify the area’s operators identified through the notification center; an operator known to have no facilities in the area need not be notified, but the excavator remains responsible for facility damage if the notification center was not notified. Give notice at least 48 hours before work, excluding the notification date, Saturdays, Sundays and legal holidays. Check positive responses at the notification center before excavation or demolition to ensure all operators have responded and all potentially affected facilities have been marked. A watch-and-protect response prohibits excavation within 10 feet of the operator’s facility markings without the operator or designated representative present to observe. The notice expires 14 calendar days from the excavation start date; work cannot continue afterward unless a subsequent notice has been submitted under the notice requirements.
Notice details and operator markings: Covered-work notice identifies the notifier, work location, excavator/company name/address/phone, knowledgeable field contact, type/extent of work, explosives use and start date/time. The described ordinary extent is at most 1 linear mile in unincorporated areas (the incorporated-area limit is 500 linear feet). Operators generally mark or provide approximate locations before scheduled work unless otherwise agreed, and give positive responses before the notice period ends, including no-conflict responses. Approximate location is a strip 2 feet on each side of the facility, not two feet total. For watch-and-protect, the operator supplies contact name/phone and an observing representative at the ticket date/time agreed in writing. Declared-emergency relief for operator response times is not blanket permission to dig.
Long rural projects and design-only notices: A project exceeding the ordinary geographic notice limits or estimated to last more than 90 days is a defined large project. A pre-excavation meeting request may be made at least 14 calendar days before work, with proposed meeting date/time/place and contact name/phone/email. The meeting is at least 72 hours after notice unless parties choose otherwise; affected owners respond within 72 hours about attendance and coordinate a marking plan and proper notices. A design/survey response is due within 14 calendar days but authorizes no digging.
Covered excavation notice and protection: For covered excavation, notify the operators through the notification center under current section 142.6 and follow its notice period, positive responses and marking instructions before work. A design/survey ticket is not permission to excavate. Actual knowledge of unmarked hydrocarbon or hazardous-liquid facilities requires notice and marking before starting; preserve those marks and request remarking if they disappear before exposure. A watch-and-protect response requires the operator or representative at the specified work. Section 142.7 bars powered equipment directly over marked routes until precise location is determined and the facilities exposed and protected; the pavement/masonry exception goes only to that material’s depth. If the excavator cannot determine the precise location, notify the operator so it can determine the precise location before excavation or demolition continues. Emergencies endangering life, health or property allow immediate work only with reasonable precautions and prompt operator notice. Under section 142.9, immediately notify the operator and notification center of damage, including damaged protective covering. The operator must promptly dispatch personnel for temporary or permanent repair. Where danger results, keep ignition sources away and immediately protect the public/property and minimize the hazard until the operator’s personnel arrive or appropriate police/fire officials arrive and take charge. Do not backfill the immediate damaged area before repair unless authorized; repair must be by the operator or its authorized qualified personnel.
Practical digging precautions: Contact OKIE811 before excavation as a safety step even when a statutory exclusion may apply, unless the project involves no digging. A locate request is not boundary evidence, easement permission or a substitute for permits; private service lines may need separate locating.
FENCE HEIGHT AND VISIBILITY RULES
Eight-foot and four-foot branches: Published A-492(C)–(E) limits an ordinary fence to eight feet above ground and a rear fence to eight feet from ground level. A street-side corner yard abutting an interior lot’s front yard is limited to four feet and cannot extend beyond the side building line. A back-to-back corner lot may have an eight-foot fence at the property line. The special six-foot R-1-LH and Storybook Ranch provisions below remain separate and can be more restrictive.
Sight-triangle geometry: A-487.3 uses twenty-five-foot legs along the front/exterior lot lines from a public-street intersection, extending the hypotenuse to the curb. A public-street/private-driveway approach serving parking for six or more vehicles uses twenty-five-foot front-line and driveway-pavement-edge legs, extends the hypotenuse to the curb and includes the driveway between triangles. Do not apply that parking-driveway geometry indiscriminately to every house driveway.
Obstructions and visibility exceptions: A-492(F) prohibits any fence, wall or hedge portion in a sight triangle. Under A-487.3(C)–(G), the right-of-way triangle contains no parking wall, fence, sign, structure or plant growth except grasses. In the remaining sight area, no party wall, fence, sign or structure is allowed from ground to ten feet, and mature plants are limited to thirty inches; use the higher adjacent street/driveway elevation. Directional signs no higher than thirty inches, specified traffic-control signs/lighting and one private sign pole no more than one foot in diameter have limited exceptions, not fence exemptions. The text excludes one-/two-family driveway parking; this does not broadly exempt a fence from A-492. One-way streets/divided medians require the triangle only on the oncoming-traffic side.
MATERIAL AND CONSTRUCTION LIMITS
Ordinary materials: Wood: common industry-standard fence construction is recognized under section 5-81, subject to sound workmanship and the special wood-district requirements below. Vinyl/PVC: no general approval of every product follows from section 5-81; vinyl is expressly prohibited in R-1-LH and is not allowed as alternative Storybook Ranch fencing. Chain-link: apply the same industry-standard and sound-structure requirements, but it is prohibited in R-1-LH and cannot replace the required Storybook Ranch wood fence. A pool mesh specification does not waive a district material ban.
Harmful materials and required screening: A-492 prohibits electrified fencing/walls, broken glass, barbed wire and other substances reasonably calculated to cause bodily harm. The rural lawful-fence statute is not an exception to these City restrictions. Where sightproof fencing is required, A-465 calls for an attractive six- to eight-foot fence/wall of wood, masonry, stockade poles or other suitable ornate material, stable under fifteen pounds per square foot wind pressure, anchored wholly on its own land, obscuring cross-property views and maintained attractively in good repair. Required screening must exist before use/conversion and appear on building/remodel plans; an evergreen/berm alternative needs its landscape plan and the applicable district’s authorization. Commercial section 5-84 independently specifies six feet at the residential-zone interface.
R-1-LH and Storybook Ranch wood fences: In R-1-LH Single Family Large Home Residential, A-413.3(K) requires rear-yard six-foot wood stockade, stained/preserved in transparent natural color, not extending past the structure front. Metal panels, chain-link, painted wood and vinyl are prohibited. Storybook Ranch section 16-233 requires residential rear/side property-line wood stockade or decorative wood up to the front corner of the primary structure, at most six feet, with at least one gate adjacent to the primary structure. Wood/metal posts belong inside the fencing and cannot be visible from outside. No alternative fencing material is allowed; repair/replace dilapidated fences and install missing fences with a major alteration. District-specific/more-restrictive rules control under section 16-238.
Fence upkeep and vehicle enclosure: Section 5-81 requires workmanlike industry-standard materials and sound structure/appearance. Adopted 2015 IPMC sections 302.7 and 304.2 add ongoing sound repair, protection of non-decay-resistant wood and appropriate paint/corrosion maintenance. Do not allow a pool enclosure to become less effective. Section 11-30(b)(4)’s nuisance-vehicle exception permits no more than one vehicle per owner-occupied property completely behind a sightproof fence, while approved parking surfaces and lawful fence standards still apply.
Separate local pool enclosure: Published A-490.1 requires a private family/friends pool yard, without formal admission requirements, to be completely enclosed by a permanent wall/fence at least four feet high. Section 5-34 adopts the 2015 International Swimming Pool and Spa Code, inserting the City name in 101.1 and deleting administrative provisions 105.6/105.6.1–.3, 107.4–.5 and 108, without a listed section 305 amendment. Section 5-50 separately adopts the 2015 IPMC, amending the name and deleting 103.5, 106, 110.2–.4 and 111, not 302.7, 303.2 or 304.2. These independent local pool/maintenance systems do not inherit the state over-two-acre exception.
Local pool barrier design: Under adopted 2015 pool-code section 305, printed pages 14–16, outdoor pools/spas and indoor pools need barriers, except ASTM F1346 lockable spa/hot-tub covers or powered pool covers. The barrier reaches forty-eight inches above outside grade throughout its perimeter and three feet outward. Maximum lower gaps are two inches over nonsolid ground or four over solid surfaces; a pool-mounted barrier gap is at most four inches. No four-inch sphere may pass. Solid faces must resist climbing. A thirty-six-inch exterior climbing-equipment clear zone and twenty-inch water-edge separation apply.
Pool member and mesh choices: With horizontal tops less than forty-five inches apart, place rails poolside and limit upright gaps to 1¾ inches. At forty-five inches or more, upright gaps may reach four inches. Decorative openings stay within 1¾ inches. Chain-link openings, including reducing slats fastened at top and bottom, are at most 1¾ inches. Diagonals have that opening limit and at most forty-five degrees from vertical. Manufacturer-installed non-chain-link mesh stays within one inch of the installed surface, cannot lift over four inches and cannot admit a four-inch sphere beneath; attachment security at least equivalent to the specified spring-retaining safety hook is forty-five inches or higher. Mesh gates follow gate rules, deck receptacles are nonconductive and mesh cannot top an onground residential pool.
Pool gates and building-wall alternatives: Access gates accommodate locks. Pedestrian gates swing away from the water, self-close and self-latch; service gates stay locked unused. Multiple gates fix at least one leaf and self-latch the adjacent one, with no opening over half an inch within eighteen inches of the release. A release below fifty-four inches from grade belongs poolside at least three inches below the top, with the same opening protection. A dwelling or other structure wall allowing direct pool access needs listed and labeled UL2017 water-hazard entrance alarms sounding when doors, operable windows with sills below forty-eight inches or their screens open; a listed and labeled ASTM F1346 safety cover; or approved equivalent protection such as self-closing/latching doors. Alarm deactivation is at least fifty-four inches above floor in ordinary units, or forty-eight to fifty-four in required accessible/Type A/B units.
Onground walls and natural barriers: A manufacturer-authorized onground pool wall may form the barrier if based on grade and at least forty-eight inches tall around the perimeter, satisfying section 305.2. A wall-top barrier has the same outside total height; the pool wall and barrier comply with all section 305 requirements, and installation follows manufacturer instructions. Secure, lock or remove access steps/ladders unless independently enclosed; resulting openings cannot pass a four-inch sphere. Where no public shoreline access is allowed and barriers extend at least eighteen inches to/beyond the water edge, section 305.6 allows the qualifying natural-water shoreline alternative. Natural topography preventing direct access needs governing-body approval and equivalent protection under 305.7.
Existing private pool maintenance: Adopted 2015 IPMC 303.2 independently covers private pools/spas/hot tubs holding water deeper than twenty-four inches: forty-eight-inch enclosure above outside finished ground; self-closing/latching gates and doors that positively close/latch from six inches open; no reduction of enclosure safety. Only qualifying ASTM F1346 spa/hot-tub covers receive its exception. The same-edition corrected latch clause places the release poolside when below fifty-four inches above the gate bottom; confirm the corrected adopted text with the Official rather than following the reversed condition in the older 2015 commentary reproduction.
State residential pool baseline: Oklahoma-amended R328.1 applies to residential pools, spas and hot tubs requiring a permit. R328.2 requires complete swimming-pool enclosure by a barrier at least 4 feet high or a screen enclosure, with no opening passing a 4-inch sphere. Its stated exceptions cover pools, spas and hot tubs on lots in excess of 2 acres, and a pool with a power safety cover or spa with a safety cover complying with ASTM F1346. Exactly 2 acres is not in excess of 2 acres. These exceptions belong to R328.2 and do not erase an independent local requirement.
State pool gates: R328.3 separately requires exterior pedestrian access doors/gates to be self-closing and self-latching; other doors/gates must self-latch. A release below 54 inches from the bottom must be on the pool side at least 3 inches below the top, with no opening larger than ½ inch within 18 inches of it. The rule states an exception for gates equipped with a locking device. The exception is stated in the gate rule; the City’s independent enclosure requirements retain their own scope.
Partition fences on residential acreage: Title 4 §§139–148 provides a fence-viewer process when adjoining owners dispute their partition-fence obligations. Three disinterested freeholders serve: each party selects one and those two choose the third. Under §141, each viewer is allowed $1 per day, paid by the interested parties. If a party fails or refuses to appoint within 3 days after request, the county sheriff shall appoint that party’s viewer on application by the party who requested the appointment. After notice, viewers can assign shares and a time to erect or repair them. Under §140, if the assigned work is not done, the complainant may repair or rebuild it; after the viewers approve its sufficiency and certify its value and their fees, that amount may be demanded from the responsible landowner. Nonpayment for 1 month after demand permits a civil action with 1% monthly interest. This recovery depends on that statutory process, not a unilateral invoice. Partition fences remain in good repair throughout the year unless both owners agree otherwise in writing. An owner genuinely leaving land as commons, and not using it otherwise, has the stated contribution exception. Enclosing or using it otherwise changes that result.
For separately owned lands previously enclosed together without a partition fence, §144 applies when one owner wants separate occupation and the other refuses or neglects to divide the fence line or refuses to build a sufficient fence on that owner’s assigned part. The cooperating owner may obtain a division and assignment by the fence viewers. The viewers may in writing allow a reasonable construction period within 6 months, considering the season. If either owner neglects the viewers’ decision, the cooperating owner must first build their own share before building the deficient share and recovering through the statutory procedure. Opening a strip at least 16 feet wide as a public common in that situation requires 6 months’ notice. Before joining an existing partition fence when previously unenclosed land is enclosed, §146 requires payment of half its value, as determined by viewers, or an election to rebuild half. Failure to pay for 30 days after notice and demand, or to rebuild for 2 months after that election, permits the stated recovery. A division of the fence between owners of improved land, made by viewers or written agreement and recorded with the county clerk where the land lies, binds those owners and their heirs and assigns, who must support it accordingly. When the owner is a nonresident of the county, proceedings involving the occupant or tenant do not bind the owner without notice. These are scoped statutory procedures, not a universal suburban fence-bill rule.
Lawful-fence construction for the applicable rural/partition-fence setting: Under 4 O.S. §154, the rail/board option uses 3 substantial rails, or 3 boards at least 6 inches wide and ¾ inch thick, on substantial posts no more than 10 feet apart for rails or 8 feet for boards, substantially built and maintained, or another fence the viewers deem equivalent. The bottom rail, wire or board is 16–20 inches above ground and the fence is 54 inches high. The barbed-wire alternative uses 3 barbed wires or 4 wires, 2 barbed, with posts no more than 2 rods apart and 2 stays between, or 1 rod apart without stays; its top wire is 54–58 inches and bottom wire 16–20 inches above ground. A party wanting a tighter partition fence bears the added expense and may remove that party’s added material. If both adjoining owners or occupants use it to restrain swine, goats or sheep, each must keep the respective share tight enough for those animals. These standards do not override an applicable City height or material restriction.
PRIVATE RESTRICTIONS
Recorded covenants, homeowners’ association architectural requirements, private easements and boundary, maintenance or cost agreements can impose independent fence conditions within applicable Oklahoma law. Review the actual instruments and obtain required private approvals separately from City permits. An approved plat or development condition may also carry public obligations. City approval does not decide title, authorize entry onto neighboring land or allocate a fence bill. The public statutory duties described above remain distinct from private agreements; a recorded partition-fence division between owners of improved land can bind successors.
REVIEW AND ENFORCEMENT CONTEXT
Fence issues are typically reviewed during permit or approval review when required, and through complaint-based code enforcement. Examples include:
• Permits and design: The specific 2025 fence amendment, separate Chapter 5 administration, commercial zoning, contractor licensing, Storybook Ranch certificates and distinct local/state appeal procedures.
• Placement and safety: Front and corner limits, sight triangles, utility easements, drainage, grading and construction stormwater approvals, floodway analyses, pool barriers and ongoing maintenance.
• Erosion controls during work: Review the construction erosion safeguards in PERMIT AND APPROVAL REQUIREMENTS, including duties that remain when a permit exemption applies.
• Private disputes: Boundary ownership, shared-fence costs, surveys, recorded instruments and applicable partition-fence procedures are separate from a City approval. Utility locates do not establish title or authorize encroachment.
USING THIS INFORMATION
This page provides general orientation on how residential fence rules are structured and applied within the City of Del City, Oklahoma. Updated November 2026.
In addition to local fence rules, certain Oklahoma laws apply statewide. See Statewide Fence Laws in Oklahoma.
It is not legal advice and does not replace official statutes, ordinances, orders, permits, certificates, development approvals, applicable building-code requirements, surveys, recorded documents or professional guidance. Rules and interpretations may change, and application may vary with municipal or unincorporated location, the authority responsible for each issue, current code requirements and amendments, zoning and site conditions, subdivision or plat conditions, easements, rights-of-way, drainage and floodplain requirements, historic or design districts, pool use, agricultural or livestock conditions, fence ownership and shared-fence duties, excavation requirements, and private restrictions subject to Oklahoma law. Before purchasing materials or beginning construction, confirm current requirements and site-specific limitations with the Del City Building Official and Planning and Zoning and the responsible office for each applicable issue, and review applicable private agreements. If this page conflicts with controlling law, adopted regulations or official requirements, the controlling authorities govern. For legal advice or legal interpretation, consult a licensed attorney.