FENCE RULES – CAMDEN (COUNTY), MISSOURI
OVERVIEW
This page covers residential fencing in unincorporated Camden County, Missouri, including the county’s Lake Area zoning district. County zoning does not cover all unincorporated county territory. Check the parcel’s actual district and any municipal boundary first. Wastewater, floodplain and land-disturbance requirements have their own coverage. Updated November 2026.
Within the zoning program, the current permit application expressly lists a fence as a residential accessory structure. Obtain the applicable zoning approval before building. The code does not provide a single ordinary residential fence-height maximum or a general wood/vinyl/chain-link approval list. An opaque street-boundary fence that could obstruct sight distance falls under the specific setback rule explained below. An ordinary yard fence, a livestock enclosure and a residential sewage-lagoon fence can have different requirements.
| Quick question | Camden County answer |
|---|---|
| Permit or approval | A fence is expressly listed on the zoning permit application. Confirm zoning jurisdiction and obtain the applicable approval. Agricultural uses and qualifying maintenance have stated exceptions; other site permits remain separate. |
| Typical fence height | No separate ordinary residential fence-height maximum is stated in the general zoning provisions. District structure-height numbers do not by themselves approve a fence of that height. Lagoon enclosures have their own minimum. |
| Placement & property lines | Keep the fence on the authorized parcel and clear of easements and road rights-of-way. Substantially opaque fencing adjacent or perpendicular to public street rights-of-way that could obstruct sight distance is expressly subject to building-setback treatment. |
| Common fence materials | Wood: no separate general yard-fence classification. Vinyl/PVC: no separate general classification. Chain-link: no separate general yard classification; tightly specified woven/chain-link construction applies to a regulated lagoon fence. |
| Important local conditions | Fence rules may be further affected by lake-band zoning coverage, recorded plats, floodplain maps, erosion control, septic systems/lagoons, historic designations, development buffers, livestock, licensed childcare and private restrictions. |
| Official local resource | Camden County Planning & Zoning, 573-317-3860. Identify the parcel, actual fence design and any street, lake or drainage frontage. |
The sections below explain the approvals, placement limits and special-site conditions that can affect a home fence. Start with the parcel’s actual zoning coverage, then apply the requirements relevant to the proposed enclosure.
GOVERNANCE
Camden County is a first-class, noncharter county. Its County Commission adopts county land-use regulations; the Planning Administrator administers the zoning and designated floodplain functions. Incorporated cities and villages administer their own applicable rules. A county office’s involvement in one program does not establish countywide zoning jurisdiction.
• Lake Area zoning coverage: The Unified Land-Use Code applies within the designated Camden County Zoning District. Its definition describes the voter-approved area extending not more than three-quarters of a mile in some places to not more than three and one-half miles in others from the Lake of the Ozarks’ 645-foot mean-sea-level mark. This description is not a substitute for the actual zoning map or a parcel determination. Ask Planning whether the lot is within that program and which district and recorded development approvals govern.
• Current district provisions: Use the county’s adopted February 19, 2026 replacement provisions for plats and the listed residential/commercial districts, and the A-1 provisions adopted August 20, 2026. These replace the affected older provisions; an older summary brochure is not a substitute. A pending proposed rewrite is not an adopted fence rule.
PERMIT AND APPROVAL REQUIREMENTS
• Ordinary fences and replacement: The current zoning permit application specifically lists fences with residential accessory structures. Sections 501–502 require approval for the listed residential/nonagricultural construction, alteration and relocation. A separate reference to nonagricultural accessory structures of 120 square feet or more is not a general permit exemption for a linear fence. Provide the location, height, opacity, material and whether work is repair, replacement or a new enclosure so Planning can apply the correct classification.
• Maintenance and agricultural exceptions: Section 513 exempts maintenance activities involving a structure or land area from permit/plan review while retaining the code’s other requirements. It does not call every replacement or enlargement maintenance. Agricultural uses and structures have express exceptions under Sections 502, 513 and 903. Actual agricultural/horticultural use matters; acreage or an A-1 label alone does not make a residential privacy fence an agricultural structure. The farm-building/structure exclusion retains its mapped-flood-hazard limitation.
• Application and permit term: Submit a completed application, ownership deed and the owner’s signature or notarized authorization, recorded/recordable plat or survey, and a scaled site plan with boundaries, fence location, access, easements, wastewater facilities and erosion controls. Obtain wastewater status/approval, highway or access sign-off and fire-district approvals when applicable. Staff review and a site visit establish compliance; an incomplete application is not accepted. A construction permit covers one structure, must be posted as required, and lasts one year, with one administratively granted six-month extension. Required fees are collected on submission; obtain the actual fence classification and charge rather than applying a dwelling fee.
• Separate land-disturbance approval: Section 504 requires land-disturbance approval for activity on a site exceeding one acre and expressly allows issuance to unzoned property. Its exceptions include statutory agricultural activity, residential development disturbing less than one acre, and county-required emergency/corrective public-safety work. Development disturbing one acre or more must submit its sediment/erosion plan to the Missouri Department of Natural Resources (MDNR) and supply the plan and approval for county permitting. All development must address erosion and sediment even when the permit exception applies; a verified drainage/erosion complaint can lead to corrective action.
• Historic and floodplain approvals: A zoning approval does not replace a required floodplain development permit or a certificate for designated historic property. Fence-related filling, grading and earth disturbance can be covered even if the proposed fence is small. Planning & Zoning is the route for the parcel’s mapped floodplain status and the Historic Preservation Commission process described below.
FENCE PLACEMENT RULES
• Opaque street-boundary fences: Section 916(2) expressly brings a fence into building-setback treatment when it lies along a lot boundary adjacent or perpendicular to a public street right-of-way, is substantially opaque and could obstruct sight distance. Apply the actual district’s operative setbacks to that fence. This is not a blanket statement that every open fence must sit behind all building-yard lines, nor permission to obstruct a corner or access with another design. No separate numerical ordinary-fence sight triangle is stated here.
• Rights-of-way and recorded lines: Measure required setbacks from the actual right-of-way line, not the pavement edge. The older general provision allows a centerline reference if the line is not readily determinable, but the true surveyed right-of-way controls if that estimate is wrong. The current plat provisions prohibit structures in the described recorded/platted road right-of-way. Recorded building lines and applicable declarations can also govern. A fence permit does not establish ownership, relocate a boundary or extinguish an easement.
• R-1 and R-2 setback schedules: Where the opaque-fence rule makes the district schedule applicable, the current R-1/R-2 provisions state 15 feet front from the road right-of-way, 10 feet side and 15 feet rear. Their schedule applies to the stated tracts/lots created after the regulations’ effective date. The front generally faces the street; on a corner lot, the narrower street side is the front. Lakefront residential setbacks are zero at the lake, subject to Ameren ownership and FEMA floodplain requirements. The exterior-wall/deck-footing and 24-inch overhang language concerns the structures it describes; it is not an independent permission to move a fence 24 inches into a required setback.
• Agricultural-district setbacks: Where the operative fence rule applies, current A-1 minimum structure yards are 50 feet from a publicly maintained roadway, 40 feet from a privately maintained roadway, 20 feet side and 40 feet rear. A-R states 40/30 feet for the public/private front, 20 feet side-corner, 20 feet side and 20 feet rear. The schedules retain their actual lot/date scope and agricultural/farm-use exceptions; the farm-building/structure exception does not extend into mapped flood-hazard areas. They are not universal offsets for every agricultural or open boundary fence.
• Other residential and approved-plan settings: For the R-3 schedule, a two-story structure counts its basement/lowest level as a story and has 30-foot front and 20-foot side/rear yards. Above two stories, front yards are 15 feet times the story count and side/rear yards 12 feet times that count, using the tallest building in the development. R-4 states 40 feet front and 20 feet side/rear, including the park perimeter; its lakefront-lot setback is zero. These are the schedules to consider only through the operative fence nexus, not a story formula for ordinary fence height. Parks/reserves, commercial parks and a Planned Unit Development have their actual district or approved-plan conditions.
• Drainage and fence-related grading: Keep natural contours and drainage ways undisturbed to the extent practicable. Section 504 bars a building or fill within a stream-bank distance of five times the stream’s top-of-bank width or 20 feet on each side, whichever is greater. It also limits a single created vertical slope to 25 feet before a minimum six-foot step/shelf, except mining; loose rock faces near residential/accessory areas may require a secured retaining wall. Required drainage and protective channel fencing must remain effective. A boundary fence does not authorize blocking a drainage easement or directing runoff into a sanitary sewer.
• Required grading and stormwater plans: If the county requires a sediment/erosion plan and MDNR approval was not required, Appendix D requires a plan signed and sealed by a Missouri-registered professional engineer. If MDNR approved the required plan, submit that plan and approval. Where a stormwater plan is required, conduits/channels use a 50-year, 24-hour design storm; detention/retention uses a 25-year, 24-hour event, with specified pre/post-development discharge and emergency-overflow protections. These are conditions of the triggered grading/stormwater plan, not engineering requirements for every fence post.
• Public-road obstruction: Section 229.150 prohibits willful and knowing road obstruction or damage through the specified drainage obstruction, fencing across or upon the right-of-way, hedges within road lines and other listed acts. The section has stated Natural Resources Conservation Service soil/water-conservation and precision-land-grading exceptions. It excludes charter counties and a city not within a county.
• Road-obstruction enforcement: The road overseer or county highway engineer may give tracked written notice requiring removal, approved repair or payment of reasonable costs. After thirty days from tracked delivery without compliance, the authority may petition the associate circuit court with a cost estimate. Opportunity for hearing and a granted petition precede entry. Authorized work is limited to necessary restoration to substantially the condition of adjacent roads or ditches. Court-authorized entry is not trespass. The statute supplies recovery of restoration, court and reasonable attorney costs and a tax-collected lien, with an owner-attorney-fee branch when the county does not prevail.
• Survey markers: Missouri Section 60.355 protects the listed public-land-survey corners, boundary markers, benchmarks and horizontal-control monuments from knowing removal, movement, defacement or destruction, with an exception for a registered land surveyor. The statute provides a class B misdemeanor classification, restoration-cost liability and the affected owner’s stated surveying-cost and attorney-fee remedy. A fence permit does not authorize moving a protected marker.
• Excavation notice: Fence-post excavation, including covered hand digging, augering or driving, is subject to Missouri’s underground-facility law. Section 319.026 requires notice to the notification center at least 2 working days, but not more than 10 working days, before the expected start. The statutory period begins at midnight following receipt; Saturdays, Sundays and legal holidays are not working days. Notice identifies the excavator, responsible person, location, expected start, depth and type of excavation, and the other required site/contact information. The notice service is Missouri 811. Utility locating does not establish property boundaries or grant permission to enter another property.
• Responses and an unanswered notice: Under Section 319.030, participating operators ordinarily respond within two working days unless an extension is agreed. Early excavation requires the law’s confirmation that all facilities have been located. If an operator has not responded after a proper original notice, the excavator must give the prescribed second notice before beginning. The operator then has two hours to mark or contact the excavator; a second notice received by 2 p.m. requires marking that working day, and a later notice requires marking by 10 a.m. the next working day. Only the statute’s failure-to-mark-or-contact conditions allow excavation after that process. An unanswered first notice is not immediate permission to dig, and careful work remains required.
• Ticket life and markings: The notice has an operational life ending at 11:59 p.m. 21 consecutive calendar days from the start date of work. Work may continue within the described area while the notice remains valid and markings remain visible. If work cannot begin within ten working days as described in the request, a relocate request is required before starting. Unusable marks require a remark request with the original notice timing. Excavators must reasonably preserve markings; unnecessary repeat marking caused by a failure of care can create cost liability.
• Care near facilities: The statutory approximate-location strip is ordinarily no wider than the facility width plus two feet on each side. When reinforced concrete, multiple adjacent facilities or other specified unusual conditions interfere with locating, the operator designates a wider approximate area to the best of its ability. Before excavation, the excavator determines best practices for confirming horizontal and vertical location in the actual site conditions; hand or soft digging is used when possible. An incorrectly located or unmarked facility must be reported through the notification center, and the operator must respond within two hours by contact or correct locating. The limited exclusions for specified tillage or temporary markers are not a general exemption for structural fence-post holes.
• Damage and emergency work: Damage, dislocation or disturbance of a facility or its protective items, including trace wires, encasements and protective stakes, must be reported to the notification center. Pipeline contact or damage causing a hazardous-liquid or gas release requires an immediate 911 call. The excavator must not conceal damage or attempt repairs without the facility owner’s authorization. Emergency temporary sewer repairs after notification are narrowly allowed to prevent further damage; they do not remove the reporting duty. A genuine excavation emergency permits necessary work with all reasonable precautions to protect facilities and notice as soon as practical. Within two hours of receiving the emergency notice, the operator must mark or contact the excavator with available information and, if unable to mark within that time, state when marking will occur. Separate Missouri Department of Transportation permission applies to excavation in a state highway or its right-of-way under Section 319.025, subject to its railroad-right-of-way exception.
• Livestock and division fences: Missouri’s partition-fence systems address their own livestock and adjoining-owner conditions; they do not require every residential neighbor to pay half of a decorative fence. The applicable general or local-option system determines contribution, notices, viewers, repairs and removal. County class alone does not identify that system. Under the general system, repair-entry rights concern repair of the assigned division-fence part; general removal requires all owners’ consent except the public-road opening exception. Separate statutory notice/damages provisions can apply to removal beside cultivated fields. Public permits do not decide those obligations.
FENCE HEIGHT AND VISIBILITY RULES
• Ordinary fence height: The general zoning provisions do not state a separate maximum height or a universal grade-measurement formula for an ordinary residential fence. The code’s definition of a fence is not a permission to build below a threshold without approval. District maximum structure heights—such as A-1’s 50 feet—are not a homeowner fence-height allowance. Permit conditions, sight distance, an approved plan, private restrictions and a purpose-specific enclosure can impose the controlling limit.
• Mapped floodplain property: The county’s floodplain function covers regulated special-flood-hazard land within its jurisdiction; it is not limited by assuming the Lake Area zoning band. Obtain the floodplain development permit before covered construction or other development. Use the current map and floodway determination from the Floodplain Administrator. Floodway encroachment requires the prescribed engineering demonstration of no increase in base-flood levels. Before a floodway is designated, the separate numbered-A/AE cumulative-development rule permits no more than one foot of increase. Required anchorage, flood-resistant materials, drainage and protection of utilities/wastewater facilities also apply. The one-foot cumulative rule is not an allowance to raise flood levels inside an adopted floodway.
• Historic property and earth disturbance: For a designated landmark or historic district, Appendix H requires a Certificate of Appropriateness for covered permit work, significant exterior changes, relevant archaeological earth disturbance and correction of maintenance violations. Applications are forwarded within seven days; the decision period is 45 days, followed by written notice within seven days. Work must start within six months; the certificate is issued for 18 months and may be renewed. Nominated-property interim control can last up to 180 days, subject to its public-health/safety authorization. Qualifying ordinary restoration/repair is excluded, but historic fences and gates remain within maintenance duties. After an unresolved denial and six months of unsuccessful alternatives, the stated Board of Adjustment appeal route is available.
MATERIAL AND CONSTRUCTION LIMITS
• Wood: The general zoning provisions do not separately list wood as approved or prohibited for ordinary residential fencing. The design must still satisfy applicable visibility/setback, historic, permit and private-property conditions. A solid fence can trigger the opaque street-boundary rule even if its material is otherwise acceptable.
• Vinyl/PVC: Vinyl and PVC are not separately classified in the county’s general yard-fence provisions. Product choice does not remove an easement, recorded design restriction or a special enclosure’s construction requirements.
• Chain-link and project buffers: Chain-link is not separately classified for ordinary yard fences. Where an R-3 or specified higher-intensity B-2/B-3/I-1 project adjoins R-1 or a lower-intensity district, Appendix J requires a 50-percent visual buffer under fall/winter conditions. Its normal minimum width is 25 feet and may reach 40 feet along a road. A solid fence/wall can reduce the width to no less than 15 feet with softening plants. New low/medium shrubs start at least two feet high and must be expected to reach five feet within two years. These are triggered development-buffer standards, not a general screening obligation between two ordinary R-1 homes.
• Private pools: A pool is expressly listed on the zoning application with accessory structures, but that form and the general zoning text do not supply a complete private residential pool-barrier specification. Ask Planning which pool/site and any separate fire-district requirements govern the parcel before selecting the enclosure. A municipal pool code or another county’s model-code adoption does not automatically govern unincorporated Camden County. This does not waive an independently applicable safety requirement.
• Local onsite coverage: The county’s direct onsite ordinance, 12-18-12-04, applies countywide subject to its own exceptions, not just the zoning band. It excludes specified Four Seasons Property Owners Association-controlled property outside the Village of Four Seasons, qualifying sewer-served/district property and Chapter 644-regulated disposal. A single-family residential property of three acres or more is excluded only if no reinstating condition applies: lake adjacency to a Corps/public-utility lake, effluent entering adjoining property/contamination/nuisance, or any system point within ten feet of an adjoining property line. Do not treat three acres as an unconditional exemption.
• Onsite work, permits and inspections: For regulated construction, installation, modification or repair, obtain the Wastewater Department permit before work. A qualified soil-morphology evaluation is required; it cannot be based on a percolation test. Mark the system components, lateral lengths, property boundaries and applicable setbacks for the required site visit. Applications are decided within 30 business days. A conventional/advanced system uses a state- and county-registered contractor; a property owner may install/replace a septic tank only with the required permit. Give the Wastewater Department notice and an opportunity to inspect, with notice before 9 a.m. the day preceding completion. Keep the system fully inspectable until 3 p.m. on completion day unless the Department confirms earlier inspection and approval. Do not close a system found noncompliant on inspection. The Department must provide the inspection results or confirmation that it did not inspect within three working days of completion. These onsite permits concern the sewage work, not every nearby fence.
• Emergency onsite work and permit terms: An emergency repair may precede a written permit only with prior verbal Wastewater Department consent, followed by the application and fee within five working days after beginning the repair. Do not backfill without approval. Construction/installation/modification permits ordinarily last one year; a shorter good-cause term cannot be under 60 days. Required operating permits last two years. The advanced-system branch applies to systems installed on or after January 1, 2011 that incorporate an advanced system; the separate branch covers a system determined to have caused contamination, a nuisance or an imminent health hazard to another person or property owner. The current county instructions state a $150 construction application/design permit fee; the state’s suspended $90 fee does not eliminate a county fee.
• State onsite scope: Missouri’s onsite sewage rules include single-family lagoons. Section 701.031 excludes a qualifying single-family residential lot of at least three acres, or a residential lot of at least ten acres with no single-family residential sewage system within 360 feet of another onsite system and no more than one single-family residence per ten acres in the aggregate. The exclusions do not cover the specified lots adjacent to Corps of Engineers or public-utility lakes. Every system point must be more than ten feet from adjoining lines, with no effluent trespass, surface/groundwater contamination or scientifically determined nuisance. Section 701.047 preserves more restrictive local standards.
• Residential lagoon fences: Where 19 CSR 20-3.060(6)(D)15 applies, the pond fence must be complete before dwelling occupancy and at least four feet high. Welded, woven or chain-link material must use 14-gauge-or-heavier wire; cattle/hog panels may substitute with tee-post line posts. Posts must be pressure-treated wood or galvanized/painted steel, driven, tamped or concrete-set; line spacing cannot exceed ten feet and corner posts must be properly braced. Sound construction must leave no bottom gaps.
• Lagoon geometry and gates: The fence location is no closer to the operating water edge than the berm center, measured with the water at the three-foot operating level. Three feet describes operating water depth, not a horizontal fence-to-water setback. The gate must be properly hinged, four feet high, of comparable materials and effectively latched. The rule recommends, rather than mandates, line-post depth of 18 inches, corner-post depth of 24 inches, a setback no greater than 30 feet from the water edge and gate width of 36–48 inches. These recommendations use “should,” while the fence, spacing, bracing, gate and occupancy requirements use mandatory language.
• Livestock on residential acreage: Section 270.010 makes it unlawful for an owner to permit horses, mules, asses, cattle, swine, sheep or goats to run at large outside the owner’s enclosure. Such animals may be restrained, and the sheriff or other police officer must restrain them on the officer’s own view or notice from another person. Within three days, the person restraining them must give the known owner written notice stating claimed feeding/keeping compensation and damages. The owner owes reasonable taking-up, keeping and feeding compensation and actual damages caused. For an accident on a public road or highway, the owner has the statutory defense upon establishing the animal escaped through no fault or negligence of the owner. If the owner is unknown or, after notice, fails to compensate for taking up, feeding and keeping the animals, the stray-law route applies. These duties are separate from partition-fence cost allocation.
• Licensed family childcare homes: For an actual licensed family home, 5 CSR 25-400.085 requires an outdoor play area on or adjoining the home’s premises, accessible without hazards, along with hazard protection and play-area fencing where needed against traffic, water or other hazards. For the rule’s initially-licensed-after-effective-date or new-fence cohort, play fences are at least 42 inches and prevent crawling/falling through and entrapment. Pool/wading-pool fencing must prevent child access; the specified initial-licensing cohort requires 42 inches and a locked gate. An aboveground pool may use its top fence with barricaded steps. Hazardous animals must be penned beyond children’s access.
• State-park boundaries: For a boundary beside a state park or historic site, 10 CSR 90-2.070 provides participation to prevent livestock or commercial-game intrusion. A written Fencing Request Form and director/designee approval precede participation. Division inspection considers need, resource impacts, materials, cost and boundary location; a required boundary survey’s cost is shared equally. Written approval or denial is due within sixty days after receipt of the form.
• Park participation costs and construction: On approval, the division provides all fence construction materials as its statutory cost share, while the owner constructs and the owner and successors maintain. Construction must protect park resources and cannot alter elevations to drain wetlands or impound water on department land. The fence lies on the identifiable/verified boundary unless a written variance is approved.
• Park-boundary maintenance and removal: Maintenance on park land is limited to the rule’s brush/vine/regrowth work no more than three feet inside the boundary. Vehicles and equipment require facility-manager permission, as do herbicides affecting park vegetation. Overhanging branches may be trimmed at the boundary up to eight feet above ground. Removal requires written division consent except temporary repair removal. The division does not participate in fencing lands upon which poisonous crops are planted. The division also does not participate in costs where another law or judgment already requires the owner to fence.
• Abandoned family/private burial grounds: Section 214.131 protects qualifying cemetery fences and railings from knowing injury, mutilation, removal and the other stated damage, a class A misdemeanor. Its defined site has not been deeded to the public and has had no interment for at least twenty-five years. Section 214.132 separately grants reasonable ingress and egress for usual cemetery visits during reasonable hours when the qualifying site is wholly surrounded by private land without public access, with sheriff/chief county law-officer enforcement and preserved court disinterment/removal authority.
PRIVATE RESTRICTIONS
Recorded subdivision covenants, homeowners-association rules, approved development conditions, easements and enforceable fence ownership, cost or maintenance agreements can add requirements. Section 105 preserves stricter private restrictions but does not make county employees their civil enforcers. County approval does not establish the boundary, transfer land or require a neighbor to pay for every decorative fence. Missouri law and the actual recorded document govern the private question.
REVIEW AND ENFORCEMENT CONTEXT
Fence issues are typically reviewed during permit or approval review when required, and through complaint-based code enforcement. Examples include:
• Approval and jurisdiction: Zoning-band coverage, the construction classification, permit terms and separately triggered floodplain, land-disturbance or historic approvals.
• Location and site effects: Opaque street-boundary fencing, true rights-of-way, recorded building lines, drainage, erosion and protected historic features.
• Purpose-specific construction: Development buffers, regulated lagoon gates and geometry, livestock, childcare and participating park-boundary enclosures.
• Separate private matters: Ownership, contribution, recorded covenants and access disputes remain distinct from zoning approval. The code provides Board of Adjustment appeal procedures; Planning can supply the applicable form and decision-specific deadline.
USING THIS INFORMATION
This page provides general orientation on how residential fence rules are structured and applied within Camden County, Missouri. Updated November 2026.
In addition to local fence rules, certain Missouri laws apply statewide. See Statewide Fence Laws in Missouri.
It is not legal advice and does not replace official statutes, ordinances, orders, permits, certificates, development approvals, applicable building-code requirements, surveys, recorded documents or professional guidance. Rules and interpretations may change, and application may vary with the identified municipality, including its actual municipal or county class, charter, adopted program or special district, and each function’s verified territory, the authority responsible for each issue, current code requirements and amendments, zoning and site conditions, subdivision or plat conditions, easements, rights-of-way, drainage and floodplain requirements, historic or design districts, pool use, agricultural or livestock conditions, fence ownership and shared-fence duties, excavation requirements, and private restrictions subject to Missouri law. Applicable requirements depend on the property’s actual facts and the respective authority of the identified offices. Private agreements and recorded rights remain separate from government approvals. If this page conflicts with controlling law, adopted regulations or official requirements, the controlling authorities govern.